Project Overview

Works Included:

  • Topsoil strip covering 4 hectares
  • Archaeology and Ecologist attendance
  • Groundworks and foundations
  • Installation of domestic soakaways
  • Earthworks and installation of infiltration basin
  • Adoptable foul and storm water drainage
  • Block and beam flooring system
  • Adoptable carriageway and footpath construction
  • Herringbone block paving laid to private drives and carriageway
  • Private dwelling footway and patio construction
  • Earthworks to communal open area including 1200m of footpath
  • Pumping station and wet well
  • Extensive section 278 works
  • Streetlighting and signage

Details

  • Value £6.3M
  • Client Housing Developer
  • Duration 30 Months